Map JIRA work items with QMetry

Map your Jira projects and work item types to QMetry projects so that Jira work items and QMetry data stay in sync.

Prerequisites

Before you map a Jira project with QMetry, make sure you meet the following requirements:

  • You have Project Administrator rights for the QMetry project.

  • Jira is integrated with QMetry.

  • The Jira project is enabled for integration. A Jira administrator controls which Jira projects are available. If the Jira administrator selected only specific projects, you can map only those projects. For more information, see Manage Jira Projects for QMetry Integration.

  • You have valid permissions to access the Jira projects and work item types that you want to map.

How QMetry Maps Jira Work Items

You can map one or more Jira projects to your QMetry projects. QMetry maps Jira work items to the following modules:

  • Requirements for work items such as Story, Epic, Task, and Risk.

  • Issues for work items such as Bug and Defect.

You can choose one of the following mapping options:

  • Map work items to the Requirements module only.

  • Map work items to the Issues module only.

  • Map work items to both the Requirements module and the Issues module.

Which Jira Projects You Can See

In QMetry, the list of Jira projects shows only the Jira projects that your Jira administrator enabled for integration. The QMetry Exploratory Testing add-on shows the same list.

If the Jira projects you expect to see are not listed, your Jira administrator has likely disabled them from integrating with QMetry. Contact your Jira administrator, and ask them to enable the project in Jira for QMetry Integration.

Publication date: